4 Malang Arenas · Open 06:00–24:00
Platinum Badminton

Platinum Badminton

BWF-Standard Court Rental & Turnkey Badminton Arena Contractor in Malang

4 BWF-Standard Arenas in Malang Happy Hour: 09:00 – 16:00 WIB (Setiap Hari) Turnkey GOR Contractor
3D INTERACTIVE FEASIBILITY SIMULATOR

Want to Build a Profitable Badminton Arena (GOR)?

Simulate 2–10 courts in real-time: efficient Rp 1.5M/m² clear-span building, +25% BWF facilities, monthly Net Profit & exact Break-Even Point (Years & Months).

Open GOR Calculator
4 Official Branches in Malang Swipe or click branch
GOR Platinum Arena Araya HQ · BWF Standard

Platinum Arena Araya Court

Kawasan Araya, Kec. Blimbing, Kota Malang, Jawa Timur

GOR Platinum Trowulan Strategic City Center

Platinum Trowulan Court

Jl. Candi Trowulan No. 32, Mojolangu, Kec. Lowokwaru, Kota Malang 65142

GOR Platinum Dieng Cool & Refreshing Arena

Platinum Dieng Court

Kawasan Lembah Dieng, Kec. Sukun, Kota Malang, Jawa Timur

GOR Platinum Karya Timur Easy Access & Spacious Parking

Platinum Karya Timur Court

Jl. Karya Timur, Purwantoro, Kec. Blimbing, Kota Malang, Jawa Timur

GOR PLATINUM ARENA ARAYA (HQ)

Branch Info →

GOR PLATINUM TROWULAN (CITY CENTER)

Branch Info →

GOR PLATINUM DIENG

Branch Info →

GOR PLATINUM KARYA TIMUR

Branch Info →

GOR CONSTRUCTION & FINANCIAL CALCULATOR

EVERGREEN MARKET & BUSINESS LONGEVITY

"Badminton arena ventures are often underestimated. Yet the badminton market is already fully established, highly loyal, and constantly thriving. Business is not merely about rapid paper ROI, but how solidly it endures to generate predictable, multi-generational cashflow."

Platinum Badminton Insight • Malang Arena Operator & National Tournament Host
PLATINUM BADMINTON TURNKEY CONTRACTOR

Build a High-Yield Badminton Arena from Scratch

Since August 3, 2021, Platinum Badminton has operated 4 profitable arenas in Malang and hosted national & international tournaments. We help you plan, construct, and operate your own badminton arena with proven construction efficiency.

1. Site Planning & Efficient Structure

Precision layout design (20m × [N×7.2m + 2m] formula) using clear-span warehouse steel structure at an efficient Rp 1.5M/m² construction rate.

2. BWF-Standard Court & Facilities (25%)

BWF shock-absorbing vinyl/interlock mats, anti-glare tournament lighting, industrial airflow, lounge, restrooms, prayer room & parking.

3. Turnkey Management & Multi-Stream Income

Powered by real-time web booking (AYO/OpenResa), 2-shift SOP (3–4 staff), plus +10% ancillary income from F&B canteen, proshop & tournaments.

PART 1: INTERACTIVE PARAMETERS

3D Arena Blueprint & Financial Parameters

Real-Time Calculation
3D Architectural Layout (Drag to rotate):
Length: 20.0 m
Width: 30.8 m (N×7,2m + 2m)
Building Area: 616 m²
Est. Land Area: 960 m²
4 Lapangan
Rp 1.500.000 / m²
Default Rp 1.5M/m² (Efficient warehouse steel structure)
25%
Default 25%: BWF carpet/interlock, tournament lights, net, fan/AC, lounge, toilet & parking
Rp 50.000/jam
200 jam/bln
Default: 200 hrs/month (~7 hrs/day, 60%–80% occupancy rate)
• Other Income (+10%): Kantin F&B, Proshop Raket/Senar, Sewa Sepatu & Parkir.
• Routine Opex: Listrik (7%), Operasional (5%), Gaji 2 Shift (3–4 org @ Rp 2,5 Jt).
PART 2: THE "AHA!" MOMENT — FEASIBILITY OUTPUT

Projected Investment, Net Profit & Break-Even Point

3. ESTIMATED BREAK-EVEN POINT (BEP) ROI +24.6% / Year
4 Tahun 1 Bulan
(4.06 Tahun / 49 Bulan)
Full initial investment (Capex) recovered in 4 Years 1 Month. Selecting 6–10 courts accelerates BEP to ~3.5 Years!
1. Total Capex (Modal Awal)
Rp 1,16 Miliar
Rp 1.155.000.000
• Main Building (1.5M/m²): Rp 924.000.000
• BWF Facilities (25%): Rp 231.000.000
• Land Acquisition: Rp 0
2. Proyeksi Net Profit Bulanan
Rp 23,7 Juta
Rp 23.700.000 / bln • Rp 284.400.000 / thn
• Court Rental (200 hrs): Rp 40.000.000
• Other Revenue (10%): Rp 4.000.000
• Staff Salary: 3 Orang — Rp 7.500.000
• Elec (7%) & Ops (5%): Rp 4.800.000
• Monthly Land Rent: Rp 8.000.000

5-Year Cumulative Net Profit vs Capex (BEP Curve)

Intersection point indicates when your initial investment is 100% recovered.

Monthly Gross Revenue Allocation

Proportion of net profit vs routine monthly operational costs.

Complete Scale Comparison Matrix (2 to 10 Courts — Click any row to simulate)

2 – 10 Courts Matrix
Lapangan Dimensi (P×L) Luas Gedung Potensi Sewa/Bln Hasil Lain (10%) SDM (Gaji) Sewa Tanah Laba Bersih/Bln Total Investasi (Capex) BEP (Tahun)
2 Lap 20m × 16.4m 328 m² Rp 20 Jt Rp 2,0 Jt 2 org (Rp 5,0 Jt) Rp 4 Jt Rp 10.600.000 Rp 615.000.000 4 Thn 10 Bln (4.83)
3 Lap 20m × 23.6m 472 m² Rp 30 Jt Rp 3,0 Jt 3 org (Rp 7,5 Jt) Rp 6 Jt Rp 15.900.000 Rp 885.000.000 4 Thn 8 Bln (4.64)
4 Lap 20m × 30.8m 616 m² Rp 40 Jt Rp 4,0 Jt 3 org (Rp 7,5 Jt) Rp 8 Jt Rp 23.700.000 Rp 1.155.000.000 4 Thn 1 Bln (4.06)
5 Lap 20m × 38m 760 m² Rp 50 Jt Rp 5,0 Jt 3 org (Rp 7,5 Jt) Rp 10 Jt Rp 31.500.000 Rp 1.425.000.000 3 Thn 9 Bln (3.77)
6 Lap 20m × 45.2m 904 m² Rp 60 Jt Rp 6,0 Jt 3 org (Rp 7,5 Jt) Rp 12 Jt Rp 39.300.000 Rp 1.695.000.000 3 Thn 7 Bln (3.59)
7 Lap 20m × 52.4m 1.048 m² Rp 70 Jt Rp 7,0 Jt 4 org (Rp 10,0 Jt) Rp 14 Jt Rp 44.600.000 Rp 1.965.000.000 3 Thn 8 Bln (3.67)
8 Lap 20m × 59.6m 1.192 m² Rp 80 Jt Rp 8,0 Jt 4 org (Rp 10,0 Jt) Rp 16 Jt Rp 52.400.000 Rp 2.235.000.000 3 Thn 7 Bln (3.55)
9 Lap 20m × 66.8m 1.336 m² Rp 90 Jt Rp 9,0 Jt 4 org (Rp 10,0 Jt) Rp 18 Jt Rp 60.200.000 Rp 2.505.000.000 3 Thn 6 Bln (3.47)
10 Lap 20m × 74m 1.480 m² Rp 100 Jt Rp 10,0 Jt 4 org (Rp 10,0 Jt) Rp 20 Jt Rp 68.000.000 Rp 2.775.000.000 3 Thn 5 Bln (3.4)

Court Rules & Player Etiquette

Arrive 15 Minutes Early

Players must arrive 15 minutes prior to schedule and complete payment.

Mandatory Non-Marking Badminton Shoes

Outdoor footwear must be removed before entering the court. Non-marking badminton shoes are mandatory.

Monthly Membership & Court Lighting

Monthly members must settle full monthly payment prior to period expiry. Lights operate strictly per rented court.

Cleanliness, Safety & Mutual Comfort

Maintain court cleanliness, respect fellow players, and safeguard personal belongings.