Platinum Badminton

Established on August 3, 2021 in Malang, Platinum Badminton provides BWF-standard badminton courts across 4 prime locations, proven host of national PBSI and Asian international tournaments, as well as turnkey badminton arena construction services.

4 BWF-Standard Arenas in Malang
4 Official Branches in Malang Swipe or click branch
GOR Platinum Arena Araya HQ · BWF Standard

Platinum Arena Araya Court

Kawasan Araya, Kec. Blimbing, Kota Malang, Jawa Timur

GOR Platinum Trowulan Strategic City Center

Platinum Trowulan Court

Jl. Candi Trowulan No. 32, Mojolangu, Kec. Lowokwaru, Kota Malang 65142

GOR Platinum Dieng Cool & Refreshing Arena

Platinum Dieng Court

Kawasan Lembah Dieng, Kec. Sukun, Kota Malang, Jawa Timur

GOR Platinum Karya Timur Easy Access & Spacious Parking

Platinum Karya Timur Court

Jl. Karya Timur, Purwantoro, Kec. Blimbing, Kota Malang, Jawa Timur

BWF-Standard Premium Facilities Official 4 GOR

BWF Certified Vinyl Court Mats

Anti-slip textured vinyl mats with thick shock absorption layers to protect knees and player joints during intense matches.

Anti-Glare 500+ Lux LED System

Precision angled sidelights eliminating glare during overhead smashes, meeting official PBSI/BWF tournament standards.

Optimum Airflow & High Clearance

High-clearance ceiling with quiet industrial ventilation keeping the hall cool without drafts that disturb shuttlecock trajectory.

Spacious Parking, Canteen & Amenities

Comprehensive facilities: ample parking for cars & bikes, cold drinks/canteen, stringing proshop, prayer room, and clean showers.

3D Interactive Guide: How to Book Courts 3 Easy 3D Steps
Step 1 Araya

1. Choose GOR Branch

Tap a Malang branch below to preview its direct booking links:

Step 2
AYO • Araya
18:00Tersedia
19:00Penuh
20:00Booking ✓

2. Pick Slot & Pay

See real-time open slots on AYO Indonesia or chat WhatsApp CS.

Step 3

3. Check-In & Play BWF

Show your e-ticket at reception, wear non-marking shoes, and enjoy.

Wajib Sepatu Badminton
EVERGREEN MARKET & BUSINESS LONGEVITY

"Badminton arena ventures are often underestimated. Yet the badminton market is already fully established, highly loyal, and constantly thriving. Business is not merely about rapid paper ROI, but how solidly it endures to generate predictable, multi-generational cashflow."

Platinum Badminton Insight • Malang Arena Operator & National Tournament Host
PART 1: INTERACTIVE PARAMETERS

3D Arena Blueprint & Financial Parameters

Real-Time Calculation
3D Architectural Layout (Drag to rotate):
Length: 20.0 m (Karpet 15m + Dinding 2×2,5m)
Width: 30.8 m (N×7,2m + 2m keliling)
Building Area (65%): 616 m²
Est. Land Area (100%): 948 m²
4 Lapangan
Step 2
Rp 1.500.000/m²
Fix Price Rp 1.500.000/m²: Struktur baja WF bentang lebar 20m tanpa tiang tengah, atap UPVC Double Layer (redam panas & suara hujan), lantai beton halus & ventilasi silang.
Formula: Building Area × Rp 1.5M 616 m²
Total Main Building Cost:
Rp 924.000.000
Step 3
Rp 30 Jt / Lap
Paket Lengkap: Karpet badminton BWF (vinyl shock absorption), instalasi lampu turnamen & kelistrikan anti-silau, tiang portable resmi, dan net BWF.
Calculation: Courts × Rp 30M 4 Lapangan
Total Equipment & Lighting:
Rp 120.000.000
Step 4
60 m² (Rp 180.000.000)
Lobby lounge santai, gudang raket/shuttlecock, toilet & mushola (Luas 60 – 150 m² @ Rp 3 Jt/m²).
Formula: Area × Rp 3M/m² 60 m²
Total Facility Construction:
Rp 180.000.000
Step 5
Rp 30.000.000
Perangkat kasir POS, bench tunggu pemain, meja resepsionis, rak proshop, kulkas & mop.
Asset Procurement Package Turnkey Ready
Total Operational Inventory:
Rp 30.000.000
BAGIAN 2: ESTIMASI TOTAL CAPEX (MODAL AWAL)

Ringkasan Estimasi Modal Awal Pembangunan GOR

Rp 1.194.000.000
1. Gedung Lapangan Utama
Rp 924.000.000
2. Alat & Fasilitas BWF
Rp 270.000.000
Total Modal Capex (1+2)
Rp 1,19 Miliar
PARAMETER PERHITUNGAN PENDAPATAN DAN PENGELUARAN

Simulasi Arus Kas Bulanan (Cashflow Bulanan)

Step 1
Rp 50.000/jam
Pilihan Jam Sewa / Bulan:
N Lapangan × Jam × Tarif/Jam Omset Sewa
Pendapatan Sewa Lapangan / Bulan:
Rp 40.000.000
Step 2
Estimasi 10% dari omset sewa lapangan: Kantin F&B, sewa raket/sepatu, proshop & retribusi parkir.
Hasil 10% dari Sewa Lapangan:
Rp 4.000.000
Total Pendapatan Kotor / Bulan:
Rp 44.000.000
Step 3
Listrik & Ops Lapangan (7%): Rp 2.800.000
4 Orang
Rp 2.500.000 / org
Total Gaji SDM = Jumlah Karyawan × Gaji per Orang (2 shift).
Rp 96.000.000 / thn
Setara Rp 0 (tanah sendiri) s/d Rp 600 Jt/thn dibagi 12 bln.
Rincian Beban Operasional / Bulan:
• Gaji SDM (Karyawan):
Rp 10.000.000 / bln
• Biaya Sewa Tanah (dibagi 12 bln):
Rp 8.000.000 / bln
POTENSI LABA BERSIH PERBULAN Net Profit
Rp 23.200.000
Total Omset Kotor dikurangi Listrik (7%), Gaji Karyawan, dan Sewa Tanah Bulanan.
BAGIAN 3: TITIK BALIK MODAL (BEP & CASHFLOW)

Proyeksi Waktu Impas (BEP) & Arus Kas 5 Tahun

TITIK BALIK MODAL (BEP) ROI +24.6% / Tahun
4 Tahun 2 Bulan
(4.20 Tahun / 50 Bulan)

5-Year Cumulative Net Profit vs Capex (BEP Curve)

Intersection point indicates when your initial investment is 100% recovered.

Monthly Gross Revenue Allocation

Proportion of net profit vs routine monthly operational costs.

Complete Scale Comparison Matrix (2 to 20 Courts — Click any row to simulate)

2 – 20 Courts Matrix
Lapangan Dimensi (P×L) Luas Gedung Est. Luas Tanah Tarif Sewa/Jam Potensi Sewa/Bln Hasil Lain (10%) SDM (Gaji) Sewa Tanah/Bln Laba Bersih/Bln Total Investasi (Capex) BEP (Tahun)
2 Lap 20m × 16.4m 328 m² 505 m² Rp 50 Rb Rp 20 Jt Rp 2,0 Jt 3 org (Rp 7,5 Jt) Rp 4,0 Jt Rp 9.100.000 Rp 762.000.000 7 Thn 0 Bln (6.98)
3 Lap 20m × 23.6m 472 m² 726 m² Rp 50 Rb Rp 30 Jt Rp 3,0 Jt 4 org (Rp 10,0 Jt) Rp 6,0 Jt Rp 14.900.000 Rp 1.008.000.000 5 Thn 8 Bln (5.64)
4 Lap 20m × 30.8m 616 m² 948 m² Rp 50 Rb Rp 40 Jt Rp 4,0 Jt 4 org (Rp 10,0 Jt) Rp 8,0 Jt Rp 23.200.000 Rp 1.254.000.000 4 Thn 6 Bln (4.5)
5 Lap 20m × 38m 760 m² 1.169 m² Rp 50 Rb Rp 50 Jt Rp 5,0 Jt 4 org (Rp 10,0 Jt) Rp 10,0 Jt Rp 31.500.000 Rp 1.500.000.000 4 Thn 0 Bln (3.97)
6 Lap 20m × 45.2m 904 m² 1.391 m² Rp 50 Rb Rp 60 Jt Rp 6,0 Jt 4 org (Rp 10,0 Jt) Rp 12,0 Jt Rp 39.800.000 Rp 1.746.000.000 3 Thn 8 Bln (3.66)
7 Lap 20m × 52.4m 1.048 m² 1.612 m² Rp 50 Rb Rp 70 Jt Rp 7,0 Jt 5 org (Rp 12,5 Jt) Rp 14,0 Jt Rp 45.600.000 Rp 1.992.000.000 3 Thn 8 Bln (3.64)
8 Lap 20m × 59.6m 1.192 m² 1.834 m² Rp 50 Rb Rp 80 Jt Rp 8,0 Jt 5 org (Rp 12,5 Jt) Rp 16,0 Jt Rp 53.900.000 Rp 2.238.000.000 3 Thn 6 Bln (3.46)
9 Lap 20m × 66.8m 1.336 m² 2.055 m² Rp 50 Rb Rp 90 Jt Rp 9,0 Jt 5 org (Rp 12,5 Jt) Rp 18,0 Jt Rp 62.200.000 Rp 2.484.000.000 3 Thn 4 Bln (3.33)
10 Lap 20m × 74m 1.480 m² 2.277 m² Rp 50 Rb Rp 100 Jt Rp 10,0 Jt 5 org (Rp 12,5 Jt) Rp 20,0 Jt Rp 70.500.000 Rp 2.730.000.000 3 Thn 3 Bln (3.23)
11 Lap 20m × 81.2m 1.624 m² 2.498 m² Rp 50 Rb Rp 110 Jt Rp 11,0 Jt 6 org (Rp 15,0 Jt) Rp 22,0 Jt Rp 76.300.000 Rp 2.976.000.000 3 Thn 3 Bln (3.25)
12 Lap 20m × 88.4m 1.768 m² 2.720 m² Rp 50 Rb Rp 120 Jt Rp 12,0 Jt 6 org (Rp 15,0 Jt) Rp 24,0 Jt Rp 84.600.000 Rp 3.222.000.000 3 Thn 2 Bln (3.17)
13 Lap 20m × 95.6m 1.912 m² 2.942 m² Rp 50 Rb Rp 130 Jt Rp 13,0 Jt 6 org (Rp 15,0 Jt) Rp 26,0 Jt Rp 92.900.000 Rp 3.468.000.000 3 Thn 1 Bln (3.11)
14 Lap 20m × 102.8m 2.056 m² 3.163 m² Rp 50 Rb Rp 140 Jt Rp 14,0 Jt 6 org (Rp 15,0 Jt) Rp 28,0 Jt Rp 101.200.000 Rp 3.714.000.000 3 Thn 1 Bln (3.06)
15 Lap 20m × 110m 2.200 m² 3.385 m² Rp 50 Rb Rp 150 Jt Rp 15,0 Jt 6 org (Rp 15,0 Jt) Rp 30,0 Jt Rp 109.500.000 Rp 3.960.000.000 3 Thn 0 Bln (3.01)
16 Lap 20m × 117.2m 2.344 m² 3.606 m² Rp 50 Rb Rp 160 Jt Rp 16,0 Jt 8 org (Rp 20,0 Jt) Rp 32,0 Jt Rp 112.800.000 Rp 4.206.000.000 3 Thn 1 Bln (3.11)
17 Lap 20m × 124.4m 2.488 m² 3.828 m² Rp 50 Rb Rp 170 Jt Rp 17,0 Jt 8 org (Rp 20,0 Jt) Rp 34,0 Jt Rp 121.100.000 Rp 4.452.000.000 3 Thn 1 Bln (3.06)
18 Lap 20m × 131.6m 2.632 m² 4.049 m² Rp 50 Rb Rp 180 Jt Rp 18,0 Jt 8 org (Rp 20,0 Jt) Rp 36,0 Jt Rp 129.400.000 Rp 4.698.000.000 3 Thn 0 Bln (3.03)
19 Lap 20m × 138.8m 2.776 m² 4.271 m² Rp 50 Rb Rp 190 Jt Rp 19,0 Jt 8 org (Rp 20,0 Jt) Rp 38,0 Jt Rp 137.700.000 Rp 4.944.000.000 3 Thn 0 Bln (2.99)
20 Lap 20m × 146m 2.920 m² 4.492 m² Rp 50 Rb Rp 200 Jt Rp 20,0 Jt 8 org (Rp 20,0 Jt) Rp 40,0 Jt Rp 146.000.000 Rp 5.190.000.000 3 Thn 0 Bln (2.96)

Court Rules & Player Etiquette

No Smoking / Vape

Strictly No Smoking & No Vaping Inside Arena

PENTING / STRICT

The entire arena interior, court hall, lounge, and restrooms are strictly smoke-free zones. Smoking is only allowed in designated outdoor areas.

Mandatory Non-Marking Badminton Shoes

STANDAR BWF

Outdoor shoes must be removed before entering court mats. Clean non-marking rubber sole badminton shoes are mandatory to protect mats and player safety.

Arrive 15 Minutes Before Schedule

TEPAT WAKTU

Players are advised to arrive 15 minutes early for warm-up and booking check-in. Court time strictly follows reservation schedule without extension.

No Food & Colored Drinks on Court Mats

KEBERSIHAN KARPET

Food, snacks, and sweet colored drinks are strictly prohibited on the court mats. Only sealed water bottles/tumblers are permitted at bench areas.

Monthly Membership & Court Lighting Protocol

MEMBER BULANAN

Monthly members must renew commitments prior to period expiry. Lighting operates strictly per booked court number and reserved time window.

Player Etiquette, Valuables & Mutual Comfort

ETIKA & KESELAMATAN

Maintain sportsmanship, dispose of trash properly, and watch your personal belongings. Management is not liable for lost unattended items.